

Subdivision groundworks completed across Mashonaland






Melfort Plots Scheme
Executed twenty-two kilometers of primary road cutting through virgin granite terrain. Works included stormwater open drain trapezoids, sub-base compaction testing, and culvert installation for large-lot residential access.
Ministry Arterial Alignments
Heavy subgrade stabilization and base-course compaction on designated transit corridors. Delivered rigorous layer works and structural stone pitch drain beds matching national highway axle-load specifications.
Glorious Brook Estates
Comprehensive greenfield scheme encompassing both internal asphalt feeder streets and complete dual-subsurface reticulation: four kilometers of uPVC sewer gravity trunks and pressure-tested potable loops.



Quality control on grade
Field records capturing underground utility bedding, stormwater headwalls, and continuous layer compaction across live sites.


Integrated delivery at Glorious Brook
Hydraulic Pressure Certification
Potable pipeline loops subjected to sustained six-bar hydrostatic tests before backfilling, ensuring full municipal compliance.
Gravity Sewer Alignment
Continuous laser-guided gradients for gravity sewer trunks to eliminate future siltation along collector corridors.
Turnkey Subterranean & Road Network
A complete 120-hectare residential enclave brought from raw bush clearing to approved local council certificate of compliance. By maintaining unified operations over heavy earthmoving, sewer reticulation, and municipal water connections, Otzar prevented contractor delays and guaranteed zero-leakage pressure test handovers across 450 serviced stands.
We arrange technical site visits across our Harare and Melfort development corridors for registered syndicates.
